Thursday, February 28, 2008
I've Been Framed
View of master bedroom.
Completed basement staircase.
Dining room.
Front door.
Staircase to second floor.
Day three of framing. View into kitchen.
Start of first floor walls on day two.
Framed Basement and first floor joists on day one.
Stacks of lumber on day one of framing.
Bay window footing
The infamous garage footings.
Poured floor with plumbing for future use bathroom.
Basement floor with slab plumbing and poly sheeting for water proofing.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
The House
First Floor
Second Floor
House Specs
~ 1,900 Finished Square Feet
~ 1,230 Square Foot Walk-out Basement
Vaulted Great Room
Vaulted Master Suite
9 Foot Ceilings
Crown Molding and Chair Rail in Dining Room
Hardwood and Tile Floors
Stainless Appliances
Gas Log Fireplace
Ceiling Fans
Jacuzzi Tub and Shower in Master Bath
Nickle Hardware
Maple Cabinets and Granite in Kitchen, Master Bath, and Second Bath
Blog Archive
▼
2008
(16)
►
August
(1)
►
July
(1)
►
June
(3)
►
May
(3)
►
April
(2)
►
March
(1)
▼
February
(2)
I've Been Framed
Every House Needs A Good Foundation...
►
January
(3)
About Me
Joyce & Ken
View my complete profile
No comments:
Post a Comment