Thursday, April 17, 2008

Green With Envy...No, It's Just The Termite Treatment

This week's progress includes adding all of the exterior doors, completing the brick veener, and istalling the fireplace insert.





View of the Kitchen with the termite treatment. The entire first floor is sprayed with this stuff.


The vent-less gas log fireplace.



View of the front with a freshly graded lot, front door, and the brick veneer.

The garage has been back-filled and tamped. I will let the ground settle for a week or two and then poor the floor.

Brick veener on back corner of the house behind the master bedroom.



Side view of garage with entry door.

Close-up of the front door.

Walk out basement with french door.

Back of the house with brick veneer, the back door, and the deck frame.

Sunday, April 6, 2008

Continued Progress


The roof was completed Thursday. I used 30 year architectural shingles. All of the windows have been set in place as well. The doors are scheduled to be set Monday.

All rough HVAC, Plumbing, and Electrical work was completed last week
2nd floor HVAC ducts and wiring

1st floor HVAC ducts and wiring

2nd floor air-return

2nd floor unit

1st floor air-return and wiring

Master-bath Shower

Master-bath Jacuzzi tub

2nd floor bath/shower

2nd floor sink plumbing

Drain lines in basement


2nd floor HVAC ducts

Kitchen Sink plumbing and wiring

Water line for icemaker and wiring

Powder room sink plumbing and wiring

HVAC ducts in basement

1st floor HVAC unit in basement

Brick Mason working on the front of the house