Thursday, April 17, 2008

Green With Envy...No, It's Just The Termite Treatment

This week's progress includes adding all of the exterior doors, completing the brick veener, and istalling the fireplace insert.





View of the Kitchen with the termite treatment. The entire first floor is sprayed with this stuff.


The vent-less gas log fireplace.



View of the front with a freshly graded lot, front door, and the brick veneer.

The garage has been back-filled and tamped. I will let the ground settle for a week or two and then poor the floor.

Brick veener on back corner of the house behind the master bedroom.



Side view of garage with entry door.

Close-up of the front door.

Walk out basement with french door.

Back of the house with brick veneer, the back door, and the deck frame.

No comments: