Sunday, April 6, 2008

Continued Progress


The roof was completed Thursday. I used 30 year architectural shingles. All of the windows have been set in place as well. The doors are scheduled to be set Monday.

All rough HVAC, Plumbing, and Electrical work was completed last week
2nd floor HVAC ducts and wiring

1st floor HVAC ducts and wiring

2nd floor air-return

2nd floor unit

1st floor air-return and wiring

Master-bath Shower

Master-bath Jacuzzi tub

2nd floor bath/shower

2nd floor sink plumbing

Drain lines in basement


2nd floor HVAC ducts

Kitchen Sink plumbing and wiring

Water line for icemaker and wiring

Powder room sink plumbing and wiring

HVAC ducts in basement

1st floor HVAC unit in basement

Brick Mason working on the front of the house