The roof was completed Thursday. I used 30 year architectural shingles. All of the windows have been set in place as well. The doors are scheduled to be set Monday.
All rough HVAC, Plumbing, and Electrical work was completed last week
1st floor HVAC ducts and wiring
2nd floor air-return
2nd floor unit
Master-bath Jacuzzi tub 2nd floor bath/shower 2nd floor sink plumbingHVAC ducts in basement
1st floor HVAC unit in basement
Brick Mason working on the front of the house
No comments:
Post a Comment