Siding
The well
The well was drilled this past week. We had to go 705 feet to hit water.
Maple cabinets have been installed in the kitchen,
the master bath, and upstairs bath.
Kitchen Island
Pantry and cabinets over the refridgerator
Sink Base
Location for oven and microwave
Kitchen sink base
Second floor bathroom sink base
Master bath sink base
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
The House
First Floor
Second Floor
House Specs
~ 1,900 Finished Square Feet
~ 1,230 Square Foot Walk-out Basement
Vaulted Great Room
Vaulted Master Suite
9 Foot Ceilings
Crown Molding and Chair Rail in Dining Room
Hardwood and Tile Floors
Stainless Appliances
Gas Log Fireplace
Ceiling Fans
Jacuzzi Tub and Shower in Master Bath
Nickle Hardware
Maple Cabinets and Granite in Kitchen, Master Bath, and Second Bath
Blog Archive
▼
2008
(16)
►
August
(1)
►
July
(1)
▼
June
(3)
Every House Needs A Little Trim
Continued Progress
Garage Door
►
May
(3)
►
April
(2)
►
March
(1)
►
February
(2)
►
January
(3)
About Me
Joyce & Ken
View my complete profile
No comments:
Post a Comment