Sunday, June 8, 2008

Continued Progress

Siding



The well



The well was drilled this past week. We had to go 705 feet to hit water.






Maple cabinets have been installed in the kitchen,
the master bath, and upstairs bath.


Kitchen Island
Pantry and cabinets over the refridgerator
Sink Base
Location for oven and microwave
Kitchen sink base

Second floor bathroom sink base

Master bath sink base